FAST · Flood Assessment System for TxDOT

Bridge Conversion — Inputs & Outputs

Project 0-7095-01

(2026.08.12 -- Andy Carter) This workflow documents how to convert bridge data from ORNL's bridge extraction methodolgy across Texas into databases and supporting files for the FAST (Flood Assesment System for TxDOT) application. File index for the ORNL bridge conversion pipeline. Statewide inputs are shared across all districts. Remote inputs and outputs change with the selected district.

Pipeline overview

Statewide inputs

input/

FileInfoSource
nbi_bridges_texas_4326.parquet Bridge thickness rubric TxDOT Bridge Division (Trent Ellis)
demDerived_reaches_split_filtered_addedAttributes_crosswalked_3081.fgb Streamlines from the Texas 3 m HAND hydrofabric ORNL — Texas (Dr. Yan Liu)
snbi_from_TxDOT_20260806_pnt_4326.fgb SNBI bridge points; fills missing NBI numbers TxDOT Bridges SNBI ↗
t_nextgen_to_nwm.parquet Crosswalk: NWM streamlines → Texas 3 m HAND streams ORNL — Texas (Dr. Yan Liu)
hydroTable_rp_bf_lmtdischarge_cda.parquet HAND rating curves per Texas 3 m HAND ORNL — Texas (Dr. Yan Liu)

Statewide outputs · all districts

FileInfo
json_bridges_20260810.zip Per-bridge cross-section JSON records — all districts (zip)
output_20260807/merged_07_02_s_bridge_pnt_4326.fgb Statewide merged bridge points (all districts)

Remote inputs · per district

FileInfo

Outputs · per district

FileInfo